My quote list

Empty Space.

Add some carts won’t ya?

Maximum file size is 10mb.

We will get back to you within 24 hours. (Unless it’s during holidays.)

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

News

Latest words from FlexQube

Stay tuned on what is happening at FlexQube®. Read about new orders and solutions as well as about industry outlook and more.

Scroll
News
FlexQube and STILL Liftrunner Tugger Train System
13 June 2019

FlexQube and STILL Liftrunner Tugger Train System

FlexQube has a long history of successful implementations of tugger trains together with STILL Liftrunner Tugger Train System, often referred to as mother daugther cart systems.

News
FlexQube and STILL GmbH signs supply and distribution agreement
12 June 2019

FlexQube and STILL GmbH signs supply and distribution agreement

The two companies have signed a supply and distribution agreement regarding sales and marketing of FlexQube products in connection with the STILL Liftrunner® system.

News
FlexQube and Linde Material Handling Tugger Trains
12 June 2019

FlexQube and Linde Material Handling Tugger Trains

FlexQube is an independent supplier of and trolleys.

News
FlexQube and Liftrunner Tugger Train System at MODEX Trade Show in Atlanta 2016
12 June 2019

FlexQube and Liftrunner Tugger Train System at MODEX Trade Show in Atlanta 2016

FlexQube has a long history of successful implementations of tugger trains together with STILL Liftrunner Tugger Train System, often referred to as mother daugther cart systems.

News
FlexQube CEO Anders Fogelberg in Affärs Världen
12 June 2019

FlexQube - Ranked top 33 on list for most prominent new technology companies in Sweden!

See link below (in Swedish)

News
First order for 4 in 1 Cart System to major Bus Manufacturer in Mexico
12 June 2019

First order for 4 in 1 Cart System to major Bus Manufacturer in Mexico

One of the largest bus manufacturers in the world has placed an order for our 4 in 1 cart system.

News
Download our Lean Production Webinar presentation
12 June 2019

Download our Lean Production Webinar presentation

Click on image below to download the presentation about lean production and its impact on material flow and intralogistics.

News
BorgWarner has placed another order for flat deck carts
12 June 2019

BorgWarner has placed another order for flat deck carts

BorgWarner has placed another order for flat deck carts to be used together with their Liftrunner E-frame system in Asheville, USA.

CEO Letters
13 more reasons than just the SEVEN to go with the FlexQube concept!
12 June 2019

13 more reasons than just the SEVEN to go with the FlexQube concept!

The FlexQube concept is built upon a standard that uses 7 as the common number.

News
FlexQUbe CEO with Liftrunner CEO
11 June 2019

FlexQube Inc. & LR Intralogistik GmbH becomes partners in selling the LiftRunner Frames in North America

This week FlexQube Inc., and LR Intralogistik GmbH entered into an exclusive seller's agreement for LR Intralogistik's popular products to Mexico, USA and Canada.

News
Shadow Boards in use at Proterra
9 May 2019

What is a Kit-Cart?

With more and more variants of the end-product for manufacturers nowadays and especially OEMs within the automotive industry there is not enough room to store all the different part numbers at the assembly line at the same time.

News
Pallet Trucks: 4 Ways To Ensure Safety and Prolong their Life
9 May 2019

Pallet Trucks: 4 Ways To Ensure Safety and Prolong their Life

The is an equipment that can be seen in every shop floor or facility across diverse industries.

Showing 181-192 of 433 items
Contact us
Close
FlexQube UK Sales manager Tim Massey

Hi, how can I help you?

Maximum file size is 10mb.

Something went wrong
Please try again or contact sales.

We will get back to you within 24 hours. (Unless it’s during holidays.)

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.